Today: 5/9/10 - Final due date: 6/2. Time to carry out project: 3.5 weeks. Basic functionality due 5/22 (2 weeks)
Each week is divided in half by a space
Week 1:
Find a remote and receiver pair and begin learning how the remote works
Draw circuit diagram with the receiver and layout the parts of the Mp3 player in their box design
Build most of the circuit and test the basics to see that the circuit works mostly
Write software to be able to switch between songs
Week 2:
Complete the circuit and learn about id3 tags and selecting songs etc
Finish learning about how the remote works and implement it into the interface to get basic control done
Write code for the interface basics to show functionality
Select songs
Sort songs by criteria
Begin battery recharging
Week 3:
Put finishing touches on the interface code
Get the remote to control the interface
Sort out the inevitable bugs
Finish rechargeable batteries
Addons?
Comments (0)